Some features of the website may not work correctly, please enable Javascript on your browser.

Porto LRT

31 . 08 . 2021

To improve the operation of the Porto LRT (Metro do Porto Line D), the track layout between the Portuguese Oncology Institute (IPO) and the most important Hospital in Porto City (São João) will need to be changed, as well as the station infrastructure in front of the Hospital, on the terminus of this line).

This Sunday, August 29th, Steconfer’s OCS team performed the enabling works to allow the dismantling of circa 300 m of the OCS system from the terminus to the IPO Station. This work also included the materialisation of a new catenary pole.

As planned, Line D was “live” again that Sunday at 10 AM and ready for operation after the successful intervention.

Our thanks to all the parties involved (Steconfer team, Casais, Metro do Porto and Via Porto).